I propose creating a gazebo world from the BIM model.
It would benefit the project to have the entire drilling mission defined in one simulation environment.
Parts that would need to be included:
- geometries from BIM model
- Pre-defined drilling positions
- ArUco markers for localization of drilling position
- Humans walking through the scene or doing some typical working motion (can be provided by TUM)