Skip to content

docs: sync version to 0.3.1 #93

docs: sync version to 0.3.1

docs: sync version to 0.3.1 #93

Triggered via pull request January 29, 2026 07:02
Status Failure
Total duration 13s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (3.11)
Process completed with exit code 1.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.10)
Process completed with exit code 1.
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
test (3.12)
The operation was canceled.