Skip to content

add more mcp

add more mcp #2

Triggered via push October 30, 2025 07:24
Status Failure
Total duration 44s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.8)
Process completed with exit code 30.
build (3.9)
The strategy configuration was canceled because "build._3_8" failed
build (3.9)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_8" failed
build (3.10)
The operation was canceled.