GATE CHECKPOINT: Phase 8 - Cluster Instrumentation #342

Description

@Franzabner

Phase 8 Gate Checkpoint (HARD GATE)

Weeks 8-9 | Must pass before baseline collection begins

  • All 4 CT clamps installed and reading correct idle power
  • CPU governor locked to performance on all nodes
  • distributed-llama loads and serves model across cluster
  • Full measurement protocol dry run completed end-to-end
  • epi-bench calculates EPI from dry run data
  • Result JSON matches schema specification

Metadata

Metadata

Assignees

No one assigned

    Labels

    gate-checkpointPhase gate checkpoint — must pass before next phase

    Projects

    Status
    Todo

    Relationships

    None yet

    Development

    No branches or pull requests