Skip to content
This repository was archived by the owner on May 16, 2026. It is now read-only.
This repository was archived by the owner on May 16, 2026. It is now read-only.

GATE 12: FACTORY Integration Checkpoint #202

Description

@Franzabner

Gate 12 Checkpoint

Phase: 12 — FACTORY Integration

Gate Criteria

  • OrchestratorClient connects to live Pi via SSH
  • Real power trace retrieved and validated
  • Live monitor streams real-time data
  • BenchmarkRunner produces results from live Pi cluster
  • First real EPI calculated and logged
  • Pareto plot and power timeline generated from real data
  • n8n workflows invoke epi-bench commands successfully
  • Telegram notification with Pareto plot verified
  • Stress tests pass (long trace, node offline, SSH loss, bulk SQLite, concurrent CLI)

Sign-off

  • All gate criteria met
  • Reviewed by project lead
  • Ready to proceed to next phase

Metadata

Metadata

Assignees

No one assigned

    Labels

    Projects

    No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions