You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
While in the middle of a Scrum session, marking someone absent, or present will update the time available to subsequent participants.
e.g. if there are 12 participants with two absent in a 15 minute meeting, they will start off with 90 seconds each. if one is marked preset, (now 11 active) the remainder will have 81 seconds each instead of 90.
Advantage of not fixing: meeting still takes 15 minutes.
Fixing this issue makes sure that people have the same time as everyone else.
The text was updated successfully, but these errors were encountered:
While in the middle of a Scrum session, marking someone absent, or present will update the time available to subsequent participants.
e.g. if there are 12 participants with two absent in a 15 minute meeting, they will start off with 90 seconds each. if one is marked preset, (now 11 active) the remainder will have 81 seconds each instead of 90.
Advantage of not fixing: meeting still takes 15 minutes.
Fixing this issue makes sure that people have the same time as everyone else.
The text was updated successfully, but these errors were encountered: