Tutorial 5: Planning and Tracking an Epic

Target audience: Project leads managing complex multi-step features Time to complete: 15-20 minutes Prerequisites: Worklog installed (Tutorial 1), familiarity with creating and updating work items

What you will learn

By the end of this tutorial you will be able to:

  • Create an epic with child work items
  • Use dependencies to control execution order
  • Track progress through stages
  • Use wl next to determine what to work on
  • Close an epic when all children are complete

Scenario

You are building a user authentication feature. This involves multiple tasks that need to be completed in a specific order. You will plan the entire feature as an epic, break it into tasks, set up dependencies, and track it to completion.

Step 1: Create the epic

wl create \
  -t "User authentication system" \
  -d "Implement login, registration, and session management for the web application" \
  -p high \
  --issue-type epic

Note the epic's ID (e.g. WI-0ABC001). All child items will reference this ID.

Step 2: Break it into child tasks

Create the individual tasks as children of the epic:

# Task 1: Database schema
wl create \
  -t "Design auth database schema" \
  -d "Create users table with email, password hash, and session fields" \
  -p high \
  --issue-type task \
  -P <epic-id>

# Task 2: Registration API
wl create \
  -t "Build registration endpoint" \
  -d "POST /api/register with email validation and password hashing" \
  -p high \
  --issue-type task \
  -P <epic-id>

# Task 3: Login API
wl create \
  -t "Build login endpoint" \
  -d "POST /api/login with credential verification and JWT token generation" \
  -p high \
  --issue-type task \
  -P <epic-id>

# Task 4: Frontend login form
wl create \
  -t "Create login page UI" \
  -d "Login form with email/password fields, error handling, and redirect" \
  -p medium \
  --issue-type task \
  -P <epic-id>

# Task 5: Integration tests
wl create \
  -t "Write auth integration tests" \
  -d "End-to-end tests for registration, login, and session flow" \
  -p medium \
  --issue-type task \
  -P <epic-id>

View the epic with all its children:

wl show <epic-id> -c

Step 3: Set up dependencies

Some tasks must be completed before others can start. Use dependency edges to enforce this:

# Registration endpoint depends on the database schema
wl dep add <registration-id> <schema-id>

# Login endpoint depends on the database schema
wl dep add <login-id> <schema-id>

# Frontend login depends on the login endpoint
wl dep add <frontend-id> <login-id>

# Integration tests depend on both endpoints
wl dep add <tests-id> <registration-id>
wl dep add <tests-id> <login-id>

View the dependency graph for any item:

wl dep list <tests-id>

This shows both inbound dependencies (items this one depends on) and outbound dependencies (items that depend on this one).

Step 4: Use wl next to find ready work

With dependencies in place, wl next automatically recommends work that is not blocked:

wl next

At this point, only "Design auth database schema" is ready because all other items depend on it (directly or transitively). Items blocked by unfinished dependencies are excluded by default.

Get multiple recommendations

wl next -n 3

Filter by assignee

wl next -a "Alice"

Step 5: Track progress through stages

Use stages to indicate workflow progress. Start working on the schema task:

wl update <schema-id> -s in-progress --stage in_progress -a "Your Name"

Common stage progression:

Stage Meaning
idea Identified but not yet analyzed
intake_complete Requirements understood
plan_complete Implementation planned
in_progress Active development
in_review Code review or QA

Track what is currently in progress:

wl in-progress

Step 6: Complete tasks and watch the epic progress

Close the schema task:

wl close <schema-id> -r "Schema migration applied and tested"

Now check what is unblocked:

wl next -n 3

Both the registration and login endpoints should now appear as ready work, since their dependency (the schema) is complete.

Continue working through the tasks:

# Start registration endpoint
wl update <registration-id> -s in-progress --stage in_progress

# ... implement ...

wl close <registration-id> -r "Registration endpoint implemented with validation"

# Start login endpoint
wl update <login-id> -s in-progress --stage in_progress

# ... implement ...

wl close <login-id> -r "Login endpoint with JWT generation complete"

After closing both endpoints, wl next will recommend the frontend and integration test tasks.

Step 7: Close the epic

An epic cannot be closed while it has open children. After closing all child tasks:

wl close <frontend-id> -r "Login page UI complete with error handling"
wl close <tests-id> -r "All auth integration tests passing"

Now close the epic itself:

wl close <epic-id> -r "User authentication system fully implemented and tested"

Verify everything is complete:

wl show <epic-id> -c

All items should show status completed.

Step 8: Use tags and search for organization

Add tags to categorize work items:

wl update <epic-id> --tags "auth,backend,q1-2026"

Search across all items:

wl search "authentication"

List items by tag:

wl list --tags "auth"

Dependency management reference

Command Description
wl dep add <item> <depends-on> Item cannot start until depends-on is complete
wl dep list <item> Show all dependencies for an item
wl dep rm <item> <depends-on> Remove a dependency
wl next Show highest-priority unblocked item
wl next --include-blocked Show all items including blocked ones

Summary

Action Command
Create epic wl create -t "Title" --issue-type epic
Add child task wl create -t "Task" -P <epic-id>
Add dependency wl dep add <item> <depends-on>
View dependencies wl dep list <item>
Find ready work wl next
Track progress wl in-progress
View epic hierarchy wl show <epic-id> -c
Close epic wl close <epic-id> -r "Reason"

Next steps