Skip to content

chore(deps): update dependency ruff to ~=0.11.0 #151

chore(deps): update dependency ruff to ~=0.11.0

chore(deps): update dependency ruff to ~=0.11.0 #151

Triggered via pull request March 14, 2025 01:02
Status Failure
Total duration 1m 34s
Artifacts

run_code_checks.yaml

on: pull_request
Matrix: Lint check / Lint check
Matrix: Type check / Type check
Matrix: Unit tests / Unit tests
Async dostrings check  /  Async docstrings check
14s
Async dostrings check / Async docstrings check
Docs check  /  Docs check
1m 25s
Docs check / Docs check
Integration tests  /  Approve integration tests for PRs from forks
Integration tests / Approve integration tests for PRs from forks
Matrix: Integration tests / Integration tests
Waiting for pending jobs
Matrix: Integration tests / Integration tests for PRs from forks
Waiting for pending jobs
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Lint check / Lint check (3.12)
Process completed with exit code 2.
Lint check / Lint check (3.10)
Process completed with exit code 2.
Lint check / Lint check (3.11)
The job was canceled because "_3_10" failed.
Lint check / Lint check (3.11)
Process completed with exit code 2.
Lint check / Lint check (3.9)
The job was canceled because "_3_10" failed.
Lint check / Lint check (3.9)
The operation was canceled.
Lint check / Lint check (3.13)
The job was canceled because "_3_10" failed.
Lint check / Lint check (3.13)
The operation was canceled.