Skip to content

chore(api-nodes): switch to credits instead of $ (#11489) #479

chore(api-nodes): switch to credits instead of $ (#11489)

chore(api-nodes): switch to credits instead of $ (#11489) #479

Triggered via push December 27, 2025 04:27
Status Cancelled
Total duration 1d 0h 0m 1s
Artifacts

test-ci.yml

on: push
Matrix: test-stable
Matrix: test-unix-nightly
Fit to window
Zoom out
Zoom in

Annotations

4 errors
test-stable (linux, 3.11, 12.1, stable)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
test-stable (linux, 3.10, 12.1, stable)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
test-stable (linux, 3.12, 12.1, stable)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
test-unix-nightly (linux, 3.11, 12.1, nightly)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s