Skip to content

Latest commit

 

History

History
44 lines (39 loc) · 2.36 KB

CHANGELOG.adoc

File metadata and controls

44 lines (39 loc) · 2.36 KB

Changelog

All notable changes to this project will be documented in this file.

The format is based on Keep a Changelog, and this project adheres to Semantic Versioning.

[Unreleased]

Added

  • docs/reports/audit/contractile-cli-audit-2026-10-03.adoc — audit of the repository and published estate for an existing contractile executable (result: none; build/contractile.just is generated output with no surviving generator).

  • docs/proposals/RFC-0001-contractile-cli.adoc (0.1.0-draft) — proposed command grammar, exit codes, six-verb surface, K9/Nickel validation and probe semantics, execution permissions, determinism, manifest/hash/receipt compatibility, packaging, conformance tests, and a phased plan. Draft — awaiting maintainer ratification.

  • docs/decisions/0002-contractile-cli-spec-first.adoc — ADR (Proposed) recording that no CLI is implemented before the specification is ratified, that build/contractile.just is a frozen generated artefact, and that the Coaptation receipt runner stays separate.

  • docs/reports/audit/contractile-estate-census-2026-10-03.adoc — read-only re-measurement of contractile deployment (runner coverage 24.1% overall; 59 _base.ncl; 132 pending-first-verify sentinels; 42 Intendfile survivors), replacing the spec’s 2026-09-01 figures for ruling purposes.

  • docs/governance/planning/contractile-cli-ratification-worksheet.adoc — decision sheet for spec rulings R1–R9 and RFC choices O1–O14, with new measured evidence for O5 (the declaration↔runner binding).

  • docs/proposals/standards-CONTRACTILE-SPEC-v1.3.0-amendment.adoc — drafted amendment text for standards/docs/CONTRACTILE-SPEC.adoc v1.3.0 (cannot be applied from this repository): closes the rulings, adds the declaration↔runner binding table, and retires the unverifiable CLI-location claim.

  • docs/governance/planning/contractile-cli-p1-backlog.adoc — issue-ready task list for phases P1–P6 with acceptance criteria, plus the drafted root-allow.txt/CODEOWNERS amendments.

  • .machine_readable/contractiles/conformance/ and <verb>/examples/{valid,invalid/*} — the spec-mandated conformance corpus (24 invalid + 6 valid fixtures) and its manifest, with the measured declaration↔schema gaps recorded as known_gaps.