Problem statement
I work a lot with aluminum and other materials that we order in stock lengths of 24 feet. I currently have my setup figure so that the assemblies each are set up to consume an appropriate proportion of the appropriate material.
However, due the varying sizes of my assemblies, it have it where sometimes the material required can't be fully allocated from the remaining portion of the material
For example, if my assembly requires 4 pieces .28 stock lengths, and my material is still full stock lengths, I'd like it to show me that I would require a 2nd full stock length be pulled come time for fabrication. As it stands it tells me that it it requires 1.12 stock length, and allocates that from the material. In reality it requires .79 of the first stock length leaving a drop of .21 stock lengths and .28 of the second stock length, with .72 stock lengths as a drop.
Suggested solution
It would be nice if there were an option that would allow you to set a part as a "linear part" or something along those lines, and when allocating material it would run a linear nesting process, outputting the actual amount of consumed stock material.
Describe alternatives you've considered
Not sure.
Examples of other systems
One software we've used in the past for production takes all the parts and optimizes them giving a report on the number of full stock lengths required. and then a report of the expected drops.
Do you want to develop this?
I want to develop this.
The text was updated successfully, but these errors were encountered:
While I can understand the need I do not think this is something that makes sense in core. From my POV this would be great as a plugin - thoughts @SchrodingersGat?
Please verify that this feature request has NOT been suggested before.
Problem statement
I work a lot with aluminum and other materials that we order in stock lengths of 24 feet. I currently have my setup figure so that the assemblies each are set up to consume an appropriate proportion of the appropriate material.
However, due the varying sizes of my assemblies, it have it where sometimes the material required can't be fully allocated from the remaining portion of the material
For example, if my assembly requires 4 pieces .28 stock lengths, and my material is still full stock lengths, I'd like it to show me that I would require a 2nd full stock length be pulled come time for fabrication. As it stands it tells me that it it requires 1.12 stock length, and allocates that from the material. In reality it requires .79 of the first stock length leaving a drop of .21 stock lengths and .28 of the second stock length, with .72 stock lengths as a drop.
Suggested solution
It would be nice if there were an option that would allow you to set a part as a "linear part" or something along those lines, and when allocating material it would run a linear nesting process, outputting the actual amount of consumed stock material.
Describe alternatives you've considered
Not sure.
Examples of other systems
One software we've used in the past for production takes all the parts and optimizes them giving a report on the number of full stock lengths required. and then a report of the expected drops.
Do you want to develop this?