how the project management should be done? Incremental or another fresh start? Set up the basic framework.
Incremental, use the same spreadsheet, add new tabs.
Keep percent progress, give them different initial value to represent the level of completeness.
Keep weekly progress as before, delta of the percent progress
Drop the pages tracker, pointless in phase 2.
how the communication should be arranged in figure, take into account the time difference between helsinki and beijing.
ad-hoc meeting until end of June.
twice per week, one in workaday, one weekly in weekend, night time in Beijing (can be discussed later, depends ...).
shall we open the case studies to contributors? how to acknowledge them? how to include different topics, by review proposal e.g.?
Not now, we have enough content already. But we can reconsider if there are strong candidates who want to contribute.
what targets to set for the second phase (code quality, text quality, image quality... )? how to measure them quantitatively? The design of excel table(s)
overall quality targets close-to-publication level, which means the text should not be fragmented, should be readable, should be logically consistent, eliminate typos and grammar mistakes.
all the code snippets should be finished. The quality should be publication-ready, no bugs, refactored.
all the images should be replaced with our own makings. The quality of images should target publication-ready. Some of the figures might need to change the format to PDF.
the possible uncertainties, including quarantine, thesis, job, etc. and how they could affect the progress
communicate with Liang whenever possible.
then just be flexible and adaptive, stay safe first.
focus on thesis first, which will be finished by the end of July; during which period a very slow progress is acceptable, but not total stop.
the timetable of second phase
target is end of the year, i.e. 2020
the work load of each chapter w.r.t. metrics above (estimation of work)
Jianxin will make an initial estimate.
open a new project.
possible principles of work mode
Chapter by chapter, focus on polishing one chapter every times.
standard of equation
as general rule, bold font for vector, normal font for scalar, capital for matrix.
fix existing writing according to general rule, in case it complicates things, we discuss.
try to align equation system if possible.
should be give out a draft pdf to the community for collecting feedback
yes, send the draft to the community
send the toc to jon
possible problem to avoid: make the text perfect at the beginning
focus on our goal, goal driven, keep track of the progress, project management.
bottom line is the book needs to be a good tech writing, correct, clear, readable, logic.
anything else?