Skip to content

Bump go.step.sm/crypto from 0.81.1 to 0.82.0 #1950

Bump go.step.sm/crypto from 0.81.1 to 0.82.0

Bump go.step.sm/crypto from 0.81.1 to 0.82.0 #1950

Triggered via pull request June 8, 2026 16:33
Status Failure
Total duration 2m 42s
Artifacts

ci.yml

on: pull_request
ci  /  ...  /  set-go-matrix
3s
ci / build / set-go-matrix
ci  /  ...  /  set-go-matrix
2s
ci / test / set-go-matrix
ci  /  ...  /  lint
1m 35s
ci / lint / lint
ci  /  ...  /  govulncheck
48s
ci / govulncheck / govulncheck
Matrix: ci / codeql / CodeQL Analyze
Matrix: ci / build / build
Matrix: ci / test / test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
ci / test / test (stable): command/health_test.go#L92
health_test.go:92: Error Trace: /home/runner/work/cli/cli/command/ca/health_test.go:92 Error: Received unexpected error: client GET https://localhost:42615/health failed: dial tcp [::1]:42615: connect: connection refused Test: Test_healthAction ---
ci / test / test (stable)
Process completed with exit code 1.
ci / test / test (oldstable)
The strategy configuration was canceled because "ci.test.test.stable" failed
ci / test / test (oldstable)
The operation was canceled.