Milestones
List view
- Due by November 15, 2026•0/3 issues closed
MeshLLM 0.79.0 stabilization. Initial audit: 328 PR contributions and 318 commits, with ported fixes attributed explicitly; final release-fix deltas remain to reconcile. No candidate is published. Preparation PR #2801 is ready for review at unchanged 4dbabb2d; its cancelled draft CI epoch was replaced by ready checks, with required results still unfinished. Full speech/version tests and both product builds passed; combined local CI passed at 383e9e0a98, and native SDK OCR source gates passed at clean 4dbabb2d. #2762, #2797 and #2799 are merged. #2799 merged as 06ac4be0 at 05:26:20Z on November 2 after auto-merge was disabled; Swift input 125067020892 remained queued at the 05:30:10Z capture. Merge is not Mac qualification. Tracker #2775 owns progress; #2776/#2777/#2779/#2768 retain SDK, plugin, speech and Windows qualification gaps. Development OCR startup/discovery/one JSON scan passed within a PARTIAL run; a separate shutdown-only control captured exit 0. Packaged RC and five-language format checks remain required. Nine unrelated held auto-merge requests are suspended with private restoration records: restore only an unchanged head after the freeze ends and no independent hold remains. All 209 claim statuses remain unchanged; release NOT_READY.
Overdue by 8 day(s)•Due by October 31, 2026•405/410 issues closed