Skip to content

ci: add lifecycle E2E to PR workflow - #47

Merged
AquiGorka merged 5 commits into
devfrom
ci/lifecycle-e2e
Mar 18, 2026
Merged

ci: add lifecycle E2E to PR workflow#47
AquiGorka merged 5 commits into
devfrom
ci/lifecycle-e2e

Conversation

@AquiGorka

Copy link
Copy Markdown
Contributor

Summary

  • Adds a lifecycle job to the PR workflow, running in parallel with the existing e2e job
  • Both depend on the build job's PR Docker image (provider_image_override)
  • The lifecycle test deploys contracts programmatically and validates the full protocol lifecycle using the PR-built provider-platform image

Dependencies

Test plan

  • Lifecycle job runs successfully once the local-dev PR lands

Adds a lifecycle job that runs in parallel with the existing e2e job.
Both depend on the build job's PR Docker image. The lifecycle test
deploys contracts programmatically and validates the full protocol
lifecycle using the PR-built provider-platform image.
@AquiGorka
AquiGorka merged commit 0de6860 into dev Mar 18, 2026
3 checks passed
@AquiGorka
AquiGorka deleted the ci/lifecycle-e2e branch March 18, 2026 21:13
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant