kpis

Weekly NSF KPI tabulation for the Regional Cabled Array, from the OOI raw data archive.

KPIs are reported per instrument per week (Mon–Sun, labeled by the following Monday) for every refDes in sitesDictionary.csv. Three NSF metrics — C1 and C3 share the delivered-bytes numerator and differ only in the denominator, C2 comes from a different source entirely:

  • C1 Technical (pct_technical) — delivered ÷ expected from raw-archive file sizes. After an instrument fails or its sampling regimen changes, the baseline expectation is adjusted for that instrument's denominator.
  • C3 Retention (pct_retention) — same numerator ÷ the full original capacity (never adjusted). Failed or down-sampled instruments read low, reflecting the true loss against original capacity.
  • C2 Science (pct_science) — % of present zarr data without a QARTOD fail flag, gross-range only (climatology excluded), averaged across parameters. Instruments without automated QARTOD (cameras, BOTPT, seismic, hydrophones) are excluded from this metric. Derived from QC'd zarr, not the raw archive.

For both C1 and C3, instruments subject to Navy diversion are recorded as 100% when there are no active missing-data reports in Nereus.

Quick start

# 0. (once / occasional) build the full-capacity baseline -> config/original_expected.csv
crawl_baseline

# 1. C1/C3 delivered side          -> reports/<date>/weekly_delivery.csv
crawl_archive --start 2025-10-01

# 2. C2 QARTOD pass-rate from zarr -> reports/<date>/weekly_science.csv   (slow, memory-heavy)
crawl_science --start 2025-10-01

# 3. join delivered + baseline/overrides + instrument status + QARTOD
compute_kpi                        # -> reports/<date>/kpi.csv + three pivots

# 4. heatmaps                      -> reports/<date>/kpi_heatmap_<metric>.png
plot_kpi --metric technical
plot_kpi --metric retention
plot_kpi --metric science

Every run writes to reports/<date>/, committed as browsable history. --date defaults to today; pass the same --date YYYY-MM-DD to all steps to rebuild a past run. Inputs live in config/ and are hand-editable.

The CLIs

crawl_baseline — full-capacity baseline (C1/C3 denominator)

p95 of weekly delivery over a recent window (default 2 yr) → config/original_expected.csv. Weekly p95 smooths daily bursts and ignores brief anomalies while reflecting sustained change. Slow; run occasionally.

crawl_baseline                                      # default: last 2 years
crawl_baseline --start 2024-06-01 --end 2026-06-01  # explicit window

crawl_archive — reporting window (delivered side)

Walks subsite/node/instrument/year/month[/day]/, sums file sizes → reports/<date>/weekly_delivery.csv (delivered bytes per instrument × complete week; partial edge weeks excluded).

crawl_archive                                       # default: last 3 months
crawl_archive --start 2026-03-01 --end 2026-06-01   # explicit window
crawl_archive --date 2026-06-25                     # override the output date tag

crawl_science — QARTOD pass-rate from zarr (C2)

Opens each instrument's zarr from S3 (ooi-data/) and computes, per week, the average-across-parameters fraction of points not flagged fail (4), excluding climatology → reports/<date>/weekly_science.csv. No-zarr instruments are omitted. --decompose adds a pct_climatology column (parses qartod_executed per-test; slower).

Run locally — this opens dozens of multi-GB S3 zarr stores and will OOM a hosted runner.

crawl_science                                       # default: last 3 months
crawl_science --start 2025-10-01 --date 2026-06-25
crawl_science --decompose                           # also emit pct_climatology

compute_kpi — join into C1 + C2 + C3

Joins weekly_delivery.csv against the baseline (original_expected.csv + baseline_overrides.csv) and instrument_status.csv, applies instrument_overrides.csv, folds in weekly_science.csv if present → reports/<date>/:

  • kpi.csv — per instrument-week: delivered_human, C1 (c1_expected_human, pct_technical), C3 (c3_expected_human, pct_retention), C2 (pct_science [+ pct_climatology]).
  • kpi_pivot_{technical,retention,science}.csv — instruments × weeks, whole-percent (capped at 100; over-delivery shown 100+), plus an ALL_INSTRUMENTS_MEAN row. C2 blank for no-zarr instruments.

Fast — it only re-joins CSVs, so re-run it freely after editing config/.

compute_kpi                          # uses today's reports/<date>/ + config/ inputs
compute_kpi --date 2026-06-25
compute_kpi --instrument-overrides /tmp/what-if.csv   # score against alternate overrides

plot_kpi — heatmap

Renders a pivot → reports/<date>/kpi_heatmap_<metric>.png. Blue = full, red = under, gray = not scored, gold 100+ = over-delivered (capped); each cell annotated with its percent.

plot_kpi --metric technical
plot_kpi --metric retention
plot_kpi --metric retention --date 2026-06-25

Curated inputs (config/)

file who maintains it what it does
original_expected.csv crawl_baseline (auto) the C1/C3 full-capacity denominator
baseline_overrides.csv hand corrects that denominator where the auto p95 is atypical
instrument_status.csv hand shrinks the C1 denominator for failed/reduced instruments
instrument_overrides.csv hand fixes or greys out a score per metric

The three hand-maintained files survive a crawl_baseline refresh. Edit and re-run compute_kpi — no re-crawl needed.

Time windows

The three hand-maintained files are all time-windowed and may hold several rows per refDes. A row covers the weeks whose Monday falls in [start_date, end_date) — end exclusive. Empty start_date means "from the beginning of time", empty end_date "still open".

Two ways to end a row, and they compose:

  • Close it — set end_date. With no successor row the week falls back to the computed default (auto p95 baseline, healthy status, no override). Best when a condition simply ended: an instrument was repaired, a bad QC test was fixed.
  • Supersede it — leave end_date empty and add a row with a later start_date. Of the rows covering a week, the one starting latest wins. Best when one value replaces another, since there is no pair of dates to keep in sync and therefore no gap to open by accident.

This is how a maintenance cruise splits the record. Old weeks keep scoring under the old assumption, so already-reported KPIs don't shift retroactively.

# instrument_status.csv — one row per fact: failed, then repaired on the cruise
refDes,status,start_date,end_date,reduced_weekly,note
CE02SHBP-LJ01D-06-CTDBPN106,failed,2025-12-01,2026-08-20,,replaced on 2026 annual cruise

# instrument_overrides.csv — greyed pre-cruise, computed after the sensor swap
refDes,start_date,end_date,pct_technical,pct_retention,pct_science,note
RS01SBPS-SF01A-3C-PARADA101,,,,,exclude,gross-range test bad on the old sensor
RS01SBPS-SF01A-3C-PARADA101,2026-08-20,,,,,new sensor installed; compute normally

Because start_date is compared against the week's Monday, a row dated 2026-08-20 (a Thursday) first applies to the week of 2026-08-24; the partial cruise week still scores under the old assumption. Date it 2026-08-17 to move the whole transition week across.

A closed window with no successor reverts to the computed value. In the two override files that means the auto p95 baseline — which is often the very number the override existed to correct. If a correction should stand for all time, leave end_date empty.

A date in these files is an effect date, not a measurement date. baseline_overrides.csv notes like "Sept 2025 avg weekly delivery" record which window the corrected number was derived from; the correction itself applies to the whole record, so those rows leave both bounds empty. Date a row only when the instrument's intended capacity actually changed then.

config/original_expected.csv — auto baseline (do not hand-edit)

Generated by crawl_baseline and overwritten on every refresh — put corrections in baseline_overrides.csv instead, which is applied on top and survives. The only config file that is not time-windowed: one full-capacity figure per instrument for the whole record.

column meaning
refDes instrument reference designator
first_day, last_day YYYYMMDD bounds of the data the p95 was computed from
weeks_with_data how many complete weeks contributed
original_p95_weekly_bytes the denominator itself
original_p95_weekly_human same, human-readable (informational)

config/instrument_status.csv — failed/reduced instruments (C1)

Only failed/reduced instruments need entries; everything else defaults to full expected.

column meaning
refDes instrument reference designator
status failed or reduced
start_date YYYY-MM-DD; first day the status applies
end_date YYYY-MM-DD when it ended (exclusive), or empty if still current
reduced_weekly reduced only: new expected per week, human-readable (e.g. 500 MiB)
note why — especially why a window was closed

failed → C1 expected 0 for those weeks; reduced → C1 expected = reduced_weekly. Outside every window the instrument is healthy at the full baseline, so setting end_date is how a repaired or replaced instrument returns to full expected capacity. C3 always uses the full original baseline, so the loss still shows in retention.

config/baseline_overrides.csv — baseline corrections (C1 and C3)

Replaces the auto p95 baseline for instruments where the observed p95 is atypical (anomaly period, commissioning burst, intentional sampling change).

column meaning
refDes instrument reference designator
start_date / end_date window this row covers, either may be empty (see time windows)
original_p95_weekly corrected full-capacity weekly volume, human-readable
note reason for correction

config/instrument_overrides.csv — per-metric fixed scores or grey-outs

column meaning
refDes instrument reference designator
start_date / end_date window this row covers, either may be empty (see time windows)
pct_technical C1 override
pct_retention C3 override
pct_science C2 override
note reason

Each metric column accepts:

value effect
(empty) compute normally
a number (e.g. 100) use that fixed score
exclude grey out (blank cell)
refDes,start_date,end_date,pct_technical,pct_retention,pct_science,note
CE02SHBP-LJ01D-11-HYDBBA106,,,100,100,exclude,Navy diversion makes the delivery score invalid

Leave a metric empty to compute it normally — e.g. <refDes>,,,,,exclude,<reason> greys C2 only and leaves C1/C3 computed, the usual shape for a mis-set QC test.

Use exclude when a computed score would be misleading (mis-set QC test, instrument not yet deployed). Use a fixed score when the true value is known from an external source (EarthScope delivery, HITL QAQC). Prefer this over zeroing the baseline. (failed in instrument_status.csv is different — it sets C1 expected to 0 while C3 continues to show the loss.)

Two precedence rules to know: C1/C3 fixed scores are skipped during failed weeks (they fall back to computed), and C2 zarr-derived values always win over a fixed pct_science when weekly_science.csv has an entry for that instrument-week.

Automation

  • Prefect deployment (prefect.yaml, flow in rca_kpis/flow.py) — first Monday of the month, 12:00 UTC, on ECS Fargate (16 vCPU / 120 GB; the C2 zarr scan is memory-heavy). Runs all three metrics sequentially: crawl_archive → crawl_science → compute_kpi → plot_kpi ×3, then commits reports/<date>/ to main (needs a GH_PAT env var in the work pool). Monthly suits quarterly reporting, and re-tabulating still heals earlier weeks as late/backfilled data arrives; trigger a one-off run for anything sooner. Crawler output (OPTAA skips, missing QARTOD, broken zarr, empty windows, peak RSS) goes to the Prefect UI and to reports/<date>/pipeline.log, committed beside the numbers — data status is often why a cell is blank or low.
  • refresh-baseline.yml (GitHub Actions) — manual only. Regenerates config/original_expected.csv. Curated overrides are untouched. Slow and shifts the C1/C3 denominator — review the diff.

Notes

  • EarthScope/Navy-diverted instruments — OBS (OBSBBA, OBSSPA), HYDLF, and HYDBBA deliver to IRIS/EarthScope or are subject to Navy diversion; OOI archive delivery is zero or invalid for these. All three groups are scored 100% C1/C3 and greyed in C2 via instrument_overrides.csv. HPIES and D1000 are in the OOI archive and tallied normally.
  • Non-standard archive paths — mapped in PATH_OVERRIDES in archive_crawler.py (e.g. D1000 logs under RASFLA301_D1000, not D1000A301).