Added LR26 test for hourly points over 60 day period with flow units (kW)#1632
Open
KarnbirKhera wants to merge 1 commit into
Open
Added LR26 test for hourly points over 60 day period with flow units (kW)#1632KarnbirKhera wants to merge 1 commit into
KarnbirKhera wants to merge 1 commit into
Conversation
Member
|
@KarnbirKhera Thank you for this contribution. The PR description states the CLA has been signed by all contributors. However, OED records do not have one for you. Thus, I would like you to:
Once this is done, this PR can be formally reviewed. Please let me know if you have any questions/thoughts. |
Author
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Added LR26 test for hourly points over 60 day period with flow units as (kW)
Description
Added the LR26 test case to readingsLineMeterRangeFlow.js which verifies that the API returns the hourly aggregated min/max points specifically for when a 60 day time window is requested @ a 15 minute flow meter with kW units.
Also includes the respective .csv file with 1440 hourly data points.
Partly addresses #962
Type of change
Checklist
Limitations
None that I am aware of in terms of the LR26 test as it passes all 891 tests using the provided the OED Docker container.