Skip to content

refactor: delegate calendar status lifecycle to presence engine

64470f0
Select commit
Loading
Failed to load commit list.
Draft

refactor: delegate calendar status lifecycle to presence engine #40398

refactor: delegate calendar status lifecycle to presence engine
64470f0
Select commit
Loading
Failed to load commit list.
Codecov / codecov/project succeeded May 5, 2026 in 1s

69.71% (-0.33%) compared to ccb047e

View this Pull Request on Codecov

69.71% (-0.33%) compared to ccb047e

Details

Codecov Report

❌ Patch coverage is 66.66667% with 2 lines in your changes missing coverage. Please review.
✅ Project coverage is 69.71%. Comparing base (ccb047e) to head (64470f0).

Additional details and impacted files

Impacted file tree graph

@@                      Coverage Diff                      @@
##           feat/presence-sync-engine   #40398      +/-   ##
=============================================================
- Coverage                      70.04%   69.71%   -0.33%     
=============================================================
  Files                           3300     3298       -2     
  Lines                         120852   119339    -1513     
  Branches                       21676    21542     -134     
=============================================================
- Hits                           84646    83202    -1444     
+ Misses                         32929    32834      -95     
- Partials                        3277     3303      +26     
🚀 New features to boost your workflow:
  • ❄️ Test Analytics: Detect flaky tests, report on failures, and find test suite problems.
  • 📦 JS Bundle Analysis: Save yourself from yourself by tracking and limiting bundle sizes in JS merges.