chore(planning): archive v1.2 milestone + mark all UAT/verification passed - #71
Merged
Merged
Conversation
…assed Close out the v1.2 — Operator Integration & Insight milestone. UAT / verification (maintainer-attested, dated 2026-05-19 — the v1.2.0 ship UAT): - Mark all 5 outstanding VERIFICATION.md files passed (17, 19, 22, 23, 24), recording the human-validation note and flagging CR-01/CR-02 (P17) and CR-01 (P23) as accepted-at-ship rather than re-run. - Check the scenario + maintainer sign-off boxes in 22/24-HUMAN-UAT.md. - Normalize every phase HUMAN-UAT frontmatter to the canonical `status: complete` (add frontmatter to 17-20 which had none) so `audit-open` reads them as done. - Add canonical `SUMMARY.md` completion markers to the 3 orphaned quick tasks. Milestone archival: - Archive ROADMAP.md -> milestones/v1.2-ROADMAP.md and REQUIREMENTS.md -> milestones/v1.2-REQUIREMENTS.md; git rm the live REQUIREMENTS.md. - Collapse ROADMAP.md to the milestone-grouping form (v1.2 marked SHIPPED 2026-05-19). - Rewrite the auto-generated MILESTONES.md v1.2 entry into the curated v1.1-style format with the correct ship date (2026-05-19), tags, and 6 key accomplishments. - PROJECT.md evolution: move all 41 v1.2 requirements to Validated, collapse the v1.2 milestone section, refresh Current State / Context / Key Decisions, point Next milestone at v1.3. - Append the v1.2 section to RETROSPECTIVE.md; refresh STATE.md project reference. No git tag created: v1.2.0 / v1.2.1 already tagged and pushed (2026-05-19). Planning docs only — no source changes. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Closes out the v1.2 — Operator Integration & Insight milestone (shipped
v1.2.02026-05-19 +v1.2.1patch). Planning-docs only — no source changes.Per project rules: this lands via PR on a feature branch (no direct commits to
main), and no git tag is created —v1.2.0/v1.2.1were already cut and pushed on 2026-05-19.Mark all UAT / verification passed
Maintainer-attested (you confirmed), dated 2026-05-19 — the v1.2.0 ship UAT:
VERIFICATION.mdfiles flippedhuman_needed → passed(17, 19, 22, 23, 24), with ahuman_validated:note. The two architectural-decision items (P17 CR-01/CR-02) and the P23 CR-01 LIKE-wildcard concern are recorded as accepted-at-ship, not re-run — kept honest, not silently hidden.22-/24-HUMAN-UAT.md(prerequisite boxes left unchecked, per the existing convention).HUMAN-UAT.mdfrontmatter normalized to the canonicalstatus: complete(added frontmatter to 17–20 which had none) soaudit-openrecognizes them.SUMMARY.mdcompletion markers.Result:
gsd-sdk query audit-open→ 0 open items.Milestone archival
ROADMAP.md→milestones/v1.2-ROADMAP.md;REQUIREMENTS.md→milestones/v1.2-REQUIREMENTS.md(thengit rm'd the live file).ROADMAP.mdcollapsed to the milestone-grouping form (v1.2 marked SHIPPED 2026-05-19, 78/78 plans).MILESTONES.md: replaced the auto-generated 78-line dump with a curated v1.1-style entry — correct ship date, tagsrc.1…rc.5+v1.2.0+v1.2.1, 6 key accomplishments, validated gates.PROJECT.mdevolution: 41 v1.2 requirements → Validated, v1.2 milestone section collapsed, Current State / Context / Key Decisions / footer refreshed, Next milestone → v1.3.RETROSPECTIVE.md: v1.2 section appended.STATE.md: project reference refreshed (statusAwaiting next milestone).Verification
audit-openclear (0 items)Next
/gsd-new-milestoneto define v1.3 — leading candidates: cross-run log search + job concurrency/queuing.🤖 Generated with Claude Code