Skip to content

Enough for initial testing that things are connected #8

Enough for initial testing that things are connected

Enough for initial testing that things are connected #8

Triggered via push November 14, 2024 23:35
Status Failure
Total duration 25s
Artifacts

lint.yml

on: push
Matrix: lint
Fit to window
Zoom out
Zoom in

Annotations

7 errors
lint (3.11)
Process completed with exit code 1.
lint (3.12)
The job was canceled because "_3_11" failed.
lint (3.12)
Process completed with exit code 1.
lint (3.10)
The job was canceled because "_3_11" failed.
lint (3.10)
The operation was canceled.
lint (3.9)
The job was canceled because "_3_11" failed.
lint (3.9)
The operation was canceled.