Skip to content

fix(line): set default z/zlevel for temporary symbol to avoid warnings.#17247

Merged
plainheart merged 1 commit into
masterfrom
fix/tmp-symbol-z
Jun 20, 2022
Merged

fix(line): set default z/zlevel for temporary symbol to avoid warnings.#17247
plainheart merged 1 commit into
masterfrom
fix/tmp-symbol-z

Conversation

@plainheart

Copy link
Copy Markdown
Member

Brief Information

This pull request is in the type of:

  • bug fixing
  • new feature
  • others

What does this PR do?

Set default z & zlevel for the temporary symbol to avoid warnings.

Fixed issues

Details

Before: What was the problem?

There is a warning log from the console when hovering on the chart

After: How does it behave after the fixing?

No warning log when hovering on the chart

Document Info

One of the following should be checked.

  • This PR doesn't relate to document changes
  • The document should be updated later
  • The document changes have been made in apache/echarts-doc#xxx

Misc

ZRender Changes

  • This PR depends on ZRender changes (ecomfe/zrender#xxx).

Related test cases or examples to use the new APIs

Please refer to the last case in test/line-case.html

Others

Merging options

  • Please squash the commits into a single one when merging.

Other information

@echarts-bot

echarts-bot Bot commented Jun 20, 2022

Copy link
Copy Markdown

Thanks for your contribution!
The community will review it ASAP. In the meanwhile, please checkout the coding standard and Wiki about How to make a pull request.

The pull request is marked to be PR: author is committer because you are a committer of this project.

@plainheart plainheart added this to the 5.4 milestone Jun 20, 2022
@plainheart plainheart merged commit 26fbb75 into master Jun 20, 2022
@echarts-bot

echarts-bot Bot commented Jun 20, 2022

Copy link
Copy Markdown

Congratulations! Your PR has been merged. Thanks for your contribution! 👍

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

3 participants