Skip to content

New baseline configuration

Latest
Compare
Choose a tag to compare
@cipriangal cipriangal released this 29 Mar 01:17
· 95 commits to master since this release

This marks the completion of cross-checks and updates to the geometry related to the dump. The 4 geometries that are setup (prex1, prex2, crex, happex2) have been run and a summary of the output can be found on the haplog: https://ace.phys.virginia.edu:80/HAPPEX/3489

Two additional detectors were added to estimate the radiation load at the Moller target location and at the entrance of the hall (numbers 2401, 2411).

Things to do in near future:

  • change material redefinition in the source code
  • remove obsolete geometry elements
  • include the second arm of the HRS
  • add detector to the side of the HRS platform
  • dump extension (from Adam) and kryptonite skin (to prevent particles going directly to the hall lid)