-
Notifications
You must be signed in to change notification settings - Fork 98
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
chore add 2025/02 TC Meeting Minutes
- Loading branch information
Showing
1 changed file
with
50 additions
and
0 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,50 @@ | ||
2025/2 TC 例会 | ||
=== | ||
|
||
## 参会人员: | ||
|
||
- felixonmars | ||
- BLumia | ||
- golf66 | ||
- shiptux | ||
- zeno | ||
- justforlxz | ||
- Quanxian Wang | ||
- Revy | ||
- UTSweetyfish | ||
- YukariChiba | ||
- pitt | ||
|
||
直接在上面追加你的昵称或名字。同时写昵称与名字会优先使用昵称。 | ||
|
||
### 已请假人员: | ||
|
||
(如果你请过假但参会了,记得删掉下面的名字) | ||
|
||
- zccrs | ||
- Avenger | ||
|
||
## 本次议题 | ||
|
||
### revy: release sig 还未成立 | ||
|
||
blumia: 现状是,根据历史(2024/9例会)讨论,由对应责任人@zccrs在双周会中公示相关的发布计划和大致的时间表 | ||
zeno: 若成立 release sig 需要/期望承担哪些职责? | ||
revy: 规划和公布整个发布周期,当前状态比较黑盒。目标是公布和约束当前的发布计划,也要明确 deepin 的发布行为是否由 TC 决策 | ||
Quanxian Wang: 参照其它开源社区,release 团队应当和 TC 分开。Ubuntu 参照:https://discourse.ubuntu.com/t/plucky-puffin-release-schedule/36461 | ||
blumia: 我们之前做的相关公示可能不够,后续关于发布周期等相关问题可以在邮件列表等位置公开讨论并得到结论,仍然侧重发布周期对外进行透明公示。(责任人不变 @zccrs) | ||
|
||
### revy: electron 包是否引入——后续跟进 | ||
|
||
历史讨论:2024/6例会 | ||
|
||
YukariChiba: 需要做相关调研 | ||
revy: 希望由 YukariChiba 发起 rfc | ||
YukariChiba: 可以 | ||
|
||
结论:责任人 @YukariChiba | ||
|
||
### revy: 希望了解deepin测试所覆盖的机型兼容性列表 | ||
|
||
Quanxian Wang: 需要确认是否可公示,可能涉及到商业机密 | ||
zeno: 社区仅适配和支持现已公开的机型,可以进行公示。责任人 @zeno |