You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Draft the backend half of next quarter's context-gap backlog — explicitly deferred subsystem context (content lifecycle, caching, workflow, upgrade tasks), plus anything discovered during M0–M3 that's out of scope for this Rock. Draft by Oct 5; reviewed with the team (merged with Fabrizzio's testing/tooling half) by Oct 8.
Acceptance Criteria
Backlog entry for content-lifecycle context (currently undocumented)
Backlog entry for caching context (currently undocumented)
Backlog entry for workflow-engine context (currently undocumented)
Backlog entry for upgrade-task context (currently undocumented)
Backlog entry for docs/integration/ — the directory exists (API_CONTRACTS.md is referenced by docs/core/SECURITY_PRINCIPLES.md:80), is unlinked from CLAUDE.md, and isn't owned by either Falcon or Scout in the current split — needs an ownership decision, not just a doc fix (discovered in M0, M0 — Backend context audit #37125). Resolved: both teams jointly own updating and keeping API_CONTRACTS.md correct. If a dev needs to update content covering endpoints clearly created by the other team, they must raise it and touch base with that team first to confirm the change makes sense before merging. Still open (mechanical, not a decision): linking it into CLAUDE.md's navigation index, and auditing its actual content against real source (never went through M1–M3's audit process).
Each entry has a one-line problem statement and a rough size estimate (S/M/L), not just a title
Backlog merged with Fabrizzio's half into one document
Reviewed with the team and confirmed ready to become next quarter's Rock
Backend half of the gap backlog is drafted — opened as a draft PR (not yet merged, pending Team Scout's half): #37697
Checked off the 6 ACs covering the drafting work (5 backlog entries + the problem-statement/size-estimate format check). The remaining 2 — merging with Fabrizzio's half into one document, and team review/confirmation — are still open and depend on Team Scout's input.
Activity
jcastro-dotcms commentedon Sep 23, 2026
Backend half of the gap backlog is drafted — opened as a draft PR (not yet merged, pending Team Scout's half): #37697
Checked off the 6 ACs covering the drafting work (5 backlog entries + the problem-statement/size-estimate format check). The remaining 2 — merging with Fabrizzio's half into one document, and team review/confirmation — are still open and depend on Team Scout's input.
github-actions commentedon Sep 25, 2026
PRs linked to this issue
docs: draft backend half of next quarter's AI-context gap backlog
docs: add Team Scout's testing/tooling half of the gap backlog
docs: backend half of next quarter's AI-context gap backlog (M4, #37129…