Skip to content

Chore: Update golangci-lint to v2#1037

Merged
hebelsan merged 11 commits intogardener:masterfrom
hebelsan:chore/golangci-lint-v2
Apr 24, 2025
Merged

Chore: Update golangci-lint to v2#1037
hebelsan merged 11 commits intogardener:masterfrom
hebelsan:chore/golangci-lint-v2

Conversation

@hebelsan
Copy link
Copy Markdown
Contributor

How to categorize this PR?

/area quality
/kind cleanup
/platform openstack

What this PR does / why we need it:
Update golangci-lint to v2

Which issue(s) this PR fixes:
Fixes #

Special notes for your reviewer:

Release note:

Update golangci-lint to v2

@hebelsan hebelsan requested review from a team as code owners April 24, 2025 08:05
@gardener-robot gardener-robot added area/quality Output qualification (tests, checks, scans, automation in general, etc.) related kind/cleanup Something that is not needed anymore and can be cleaned up platform/openstack OpenStack platform/infrastructure needs/review Needs review size/L Denotes a PR that changes 100-499 lines, ignoring generated files. needs/second-opinion Needs second review by someone else labels Apr 24, 2025
@gardener-robot-ci-1 gardener-robot-ci-1 added reviewed/ok-to-test Has approval for testing (check PR in detail before setting this label because PR is run on CI/CD) needs/ok-to-test Needs approval for testing (check PR in detail before setting this label because PR is run on CI/CD) and removed reviewed/ok-to-test Has approval for testing (check PR in detail before setting this label because PR is run on CI/CD) labels Apr 24, 2025
@hebelsan hebelsan merged commit a740418 into gardener:master Apr 24, 2025
19 checks passed
@hebelsan hebelsan deleted the chore/golangci-lint-v2 branch April 24, 2025 11:25
@gardener-robot gardener-robot added the status/closed Issue is closed (either delivered or triaged) label Apr 24, 2025
@hebelsan
Copy link
Copy Markdown
Contributor Author

/test

@testmachinery
Copy link
Copy Markdown

testmachinery Bot commented Apr 24, 2025

Testrun: e2e-9lb6h
Workflow: e2e-9lb6h-wf
Phase: Succeeded

+---------------------+-----------------------------+-----------+----------+
|        NAME         |            STEP             |   PHASE   | DURATION |
+---------------------+-----------------------------+-----------+----------+
| infrastructure-test | infrastructure-test         | Succeeded | 12m46s   |
| infrastructure-test | infrastructure-test-flow    | Succeeded | 12m17s   |
| infrastructure-test | infrastructure-test-migrate | Succeeded | 15m8s    |
| infrastructure-test | infrastructure-test-recover | Succeeded | 14m48s   |
| bastion-test        | bastion-test                | Succeeded | 10m34s   |
+---------------------+-----------------------------+-----------+----------+

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

area/quality Output qualification (tests, checks, scans, automation in general, etc.) related kind/cleanup Something that is not needed anymore and can be cleaned up needs/ok-to-test Needs approval for testing (check PR in detail before setting this label because PR is run on CI/CD) needs/review Needs review needs/second-opinion Needs second review by someone else platform/openstack OpenStack platform/infrastructure size/L Denotes a PR that changes 100-499 lines, ignoring generated files. status/closed Issue is closed (either delivered or triaged)

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants