Epic Closure Analyzer

A Jira CLI tool that analyzes epic completion patterns to predict team epic throughput for quarterly planning.

Why This Tool?

When planning quarterly releases, teams need to know: "How many epics can we realistically deliver?"

This tool analyzes your historical epic data to give you data-driven predictions based on:

  • Average epic size (items, stories, story points)
  • Historical epic closure rate
  • Team velocity and capacity

Quick Start

# 1. Make executable
chmod +x epic-analyzer.sh

# 2. Run for your project
./epic-analyzer.sh YOUR_PROJECT_KEY

# 3. Analyze last 6 months
./epic-analyzer.sh MYPROJECT 6

Example Output

━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
📈 EPIC CLOSURE ANALYSIS RESULTS
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

Total Epics Analyzed: 18
Average Items per Epic: 8.7
Average Points per Epic: 25.0
Average Stories per Epic: 7.4

━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
🎯 EPIC CLOSURE PREDICTIONS
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

Historical Epic Closure Rate:
   1.5 epics per sprint (based on 12 sprints)

Capacity-Based Prediction:
   Team velocity: 80 points/sprint
   Avg epic size: 25.0 points
   Capacity rate: 2.7 epics/sprint (85% epic-focused)

Recommended Planning Assumptions:
   📊 Conservative: 1.4 epics/sprint
   📊 Expected: 1.5 epics/sprint
   📊 Optimistic: 1.7 epics/sprint

Quarterly Projection (6 sprints):
   📊 Conservative: 8 epics/quarter
   📊 Expected: 9 epics/quarter
   📊 Optimistic: 10 epics/quarter

What It Does

  1. Queries Jira for all completed epics (Status = Closed, Resolution = Done)
  2. Analyzes each epic:
    • Child issue count (stories, tasks, bugs)
    • Story points (if configured)
    • Story count
  3. Calculates averages across all epics
  4. Generates predictions:
    • Historical rate (actual epic closures / sprints)
    • Capacity-based rate (velocity / avg epic size)
    • Conservative/Expected/Optimistic scenarios
  5. Exports JSON with detailed data for further analysis

Prerequisites

  • Jira CLI installed and configured
  • bc (basic calculator) - pre-installed on macOS/Linux
  • Access to Jira project with Epic issue type

Install Jira CLI

# macOS
brew install ankitpokhrel/jira-cli/jira-cli

# Linux
# See: https://github.com/ankitpokhrel/jira-cli#installation

# Configure
jira init

Configuration

Basic Settings

Edit these variables in the script (lines 15-21):

PROJECT="${1:-YOUR_PROJECT}"  # Your default project key
LOOKBACK_MONTHS="${2:-12}"    # How far back to analyze

SPRINT_LENGTH_WEEKS=2         # Your sprint length
SPRINT_VELOCITY=80            # Your team's average velocity

Story Point Field

If story points show as 0, you need to configure the custom field:

# Line 92: Update to your story point field ID
POINTS=$(jira issue view "$EPIC_KEY" --template '{{.fields.customfield_XXXXX}}' ...)

To find your field ID:

jira issue view EPIC-123 --template '{{.}}' | grep -i "story\|point"

Common field IDs:

  • customfield_10016 - Jira Cloud default
  • customfield_10002 - Some Jira Server instances

Epic Link Field

If your Jira uses a different epic link field name (line 85):

CHILD_JQL="'Your Epic Link Field' = $EPIC_KEY OR parent = $EPIC_KEY"

Output Files

Console Output

Human-readable summary with predictions (see example above)

JSON Export

{PROJECT}_epic_analysis_YYYYMMDD.json

{
  "analysis_date": "2026-04-09",
  "project": "MYPROJECT",
  "total_epics_closed": 18,
  "epics": [
    {
      "key": "PROJ-123",
      "child_count": 8,
      "story_count": 6,
      "points": 24
    }
  ],
  "summary": {
    "total_items": 156,
    "total_points": 450,
    "total_stories": 132,
    "avg_items_per_epic": 8.7,
    "avg_points_per_epic": 25.0,
    "avg_stories_per_epic": 7.3
  }
}

Use Cases

1. Quarterly Planning

Question: "How many epics can we commit to in Q2?"

Run analysis before quarterly planning:

./epic-analyzer.sh MYPROJ 6

Use Conservative prediction for committed deliverables, Expected for roadmap planning.

2. Epic Scoping

Question: "Are our epics too large?"

Guideline:

  • Small epic: 5-8 items, 15-25 points (1-2 sprints)
  • Medium epic: 8-15 items, 25-45 points (2-4 sprints)
  • Large epic: >15 items → Consider splitting

If your average is >10 items, your epics may be over-scoped.

3. Trend Analysis

Question: "Is our epic throughput improving?"

Run monthly and compare results:

./epic-analyzer.sh MYPROJ 3 > results_$(date +%Y%m).txt

4. Stakeholder Communication

Use data-driven delivery predictions:

"Based on our last 6 months of data, we close an average of 2.5 epics per sprint. For Q2 (6 sprints), we can commit to 12 epics (conservative) with a stretch goal of 15 epics (expected)."

Best Practices

When to Run

  • Before quarterly planning (6-12 month lookback)
  • Monthly to track trends (3 month lookback)
  • After major changes (epic scoping, team size, process changes)

Right-Sizing Epics

Signs your epics are over-scoped:

  • Average >10 items per epic
  • Epics in progress for >4 sprints
  • Historical closure rate < capacity prediction

How to fix:

  1. Scope epics to ONLY committed work
  2. Move lower-priority work to separate epics
  3. Target: 5-8 items, 15-25 points per epic

Interpreting Results

If Historical < Capacity:

  • Epics may be over-scoped
  • Action: Scope epics tighter, focus on completing 2-3 per sprint

If Historical ≈ Capacity:

  • Good alignment! Use historical rate for planning

If Historical > Capacity:

  • Epics may be under-scoped, or velocity assumption too low
  • Action: Review velocity setting in script

Troubleshooting

No epics found

# Check epics exist
jira issue list --jql 'project = MYPROJ AND type = Epic' --plain

# Check status and resolution values
jira issue list --jql 'project = MYPROJ AND type = Epic' --columns status,resolution --plain

Update JQL on line 40 to match your workflow.

Authentication errors

# Re-initialize Jira CLI
jira init

Story points show as 0

See Configuration section to update custom field.

Contributing

Suggestions and improvements welcome! Open an issue or pull request.

License

MIT License - Free to use and modify

Related Tools

By @dramseur:

Together, these tools provide complete visibility into agile team performance.

About

Jira CLI tool to analyze epic completion patterns and predict quarterly throughput

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages