-
Notifications
You must be signed in to change notification settings - Fork 35
Pull requests: openshift/cert-manager-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
rand deprecation: seed no longer needed
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#243
opened Feb 6, 2025 by
sebrandon1
Loading…
context consistency: ensure all context are TODO()
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#242
opened Feb 6, 2025 by
sebrandon1
Loading…
OCPBUGS-49454: debug ACME dns-01 Route53 ambient credentials
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#241
opened Feb 6, 2025 by
lunarwhite
•
Draft
feat: Add resource limits and requests flags for ACME HTTP01 solver pods
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#240
opened Jan 29, 2025 by
appiepollo14
Loading…
feat: Allows for override replicas quantity to deploy a HA cert manager
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#237
opened Jan 27, 2025 by
appiepollo14
Loading…
CM-424: Allow feature specific controller gating for operator TechPreview features
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#229
opened Jan 8, 2025 by
swghosh
Loading…
3 tasks done
OCPBUGS-41727: AWS STS ambient acme e2e
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/severity-critical
Referenced Jira bug's severity is critical for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
update reviewers
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
#218
opened Nov 25, 2024 by
swghosh
Loading…
ProTip!
Follow long discussions with comments:>50.