Skip to content

chore(boil): Vendor openssl for better portability#1459

Merged
sbernauer merged 3 commits into
mainfrom
chore/boil-vendor-openssl
Apr 16, 2026
Merged

chore(boil): Vendor openssl for better portability#1459
sbernauer merged 3 commits into
mainfrom
chore/boil-vendor-openssl

Conversation

@sbernauer
Copy link
Copy Markdown
Member

Description

I also have to remember to have openssl available, as otherwise cargo boil fails to compile/run.
From my perspective this is internal tooling and I don't see a big downside in vendoring openssl, but please feel free to disagree ;)

While I was it I also bumped snafu

Definition of Done Checklist

Note

Not all of these items are applicable to all PRs, the author should update this template to only leave the boxes in that are relevant.

Please make sure all these things are done and tick the boxes

  • Changes are OpenShift compatible
  • All added packages (via microdnf or otherwise) have a comment on why they are added
  • Things not downloaded from Red Hat repositories should be mirrored in the Stackable repository and downloaded from there
  • All packages should have (if available) signatures/hashes verified
  • Add an entry to the CHANGELOG.md file
  • Integration tests ran successfully
TIP: Running integration tests with a new product image

The image can be built and uploaded to the kind cluster with the following commands:

boil build <IMAGE> --image-version <RELEASE_VERSION> --strip-architecture --load
kind load docker-image <MANIFEST_URI> --name=<name-of-your-test-cluster>

See the output of boil to retrieve the image manifest URI for <MANIFEST_URI>.

@sbernauer sbernauer self-assigned this Apr 14, 2026
@sbernauer sbernauer moved this to Development: Waiting for Review in Stackable Engineering Apr 14, 2026
@sbernauer sbernauer changed the title Chore/boil vendor openssl chore(boil): Vendor openssl for better portability Apr 16, 2026
@sbernauer sbernauer added this pull request to the merge queue Apr 16, 2026
@sbernauer sbernauer moved this from Development: Waiting for Review to Development: Done in Stackable Engineering Apr 16, 2026
Merged via the queue into main with commit 37acdf2 Apr 16, 2026
8 checks passed
@sbernauer sbernauer deleted the chore/boil-vendor-openssl branch April 16, 2026 14:28
Techassi added a commit that referenced this pull request Apr 16, 2026
Previous PR #1459 silently broke the patchable build, because we
currently do not build patchable on PRs (like we do for boil).
github-merge-queue Bot pushed a commit that referenced this pull request Apr 16, 2026
Previous PR #1459 silently broke the patchable build, because we
currently do not build patchable on PRs (like we do for boil).
@lfrancke lfrancke moved this from Development: Done to Done in Stackable Engineering May 6, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

Development

Successfully merging this pull request may close these issues.

3 participants