Sync unix/tcl.m4 with Tcl 9.0 #2826
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
Annotations
6 errors
test (gcc, --enable-symbols)
Failure during Test
|
test (gcc, --enable-symbols)
Process completed with exit code 1.
|
test (gcc)
The job was canceled because "gcc_--enable-symbols" failed.
|
test (gcc)
The operation was canceled.
|
test (gcc, --disable-xft)
The job was canceled because "gcc_--enable-symbols" failed.
|
test (gcc, --disable-xft)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
Tk 9.0b1 HTML documentation (snapshot)
Expired
|
2.32 MB |
|
Tk 9.0b1 Source distribution (snapshot)
Expired
|
18.4 MB |
|